Enchanted Rock was formed in 2006 to focus on technologies at or close to the point of electric consumption that reduce cost and improve reliability. In 2010 we became the first in Texas to provide utility grade backup power as a service. From 2013 to 2014, ERock installed 167 MW of distributed diesel generation at 17 sites across Texas. In 2016, we switched from diesel to natural gas in order to provide a cleaner, more reliable form of backup power. ERock has added 158.2 MW under contract with 106.2 already commissioned and 51.9 under construction since our switch to natural gas.